Recent Posts
-
Meet TYM at K 2025 -The World’ s No.1 Trade Fair for Plastics and Rubber
Welcome to the World’s No.1 Trade Fair for Plastics and Rubber -K 2025, taking place from October 8–15, 2025 at Messe Düsseldorf, Germany. As a professional LSR injection molding machine, mold, and robot solution provider, TYM Technology Co., Ltd. is proud to present our latest innovations at Booth 16E77.
09/23/2025
-
How Much A/B Mixing Ratio Error Causes Under-Cure in Liquid Silicone — and How Equipment-Level Monitoring Can Catch It
Small A/B mixing ratio errors in liquid silicone can cause under-cured parts without visible warning. Learn the tolerance thresholds and equipment monitoring methods.
08/15/2026
-
Injection Pressure / Servo Pressure Sensor Drift: How Often Should It Be Calibrated?
Injection pressure and servo sensor drift can silently degrade LSR part quality. Learn the warning signs and a practical calibration schedule.
08/13/2026
-
How to Verify Whether a Supplier's "Parts Per Hour" Claim Includes Color or Mold Changeover Time
When comparing liquid silicone rubber (LSR) injection molding machines, almost every supplier quote includes a headline number: parts per hour, or cycles per hour. It looks like the easiest number to compare — until you realize it rarely means the same thing from one supplier to the next.
08/10/2026
-
Common Failure Modes in In-Mold Assembly (IMA) on Double-Color and Double-Material LSR Machines
In-mold assembly — molding a silicone component directly onto or around a second material within a single cycle — is one of the strongest arguments for double-color and double-material LSR machines. It eliminates a secondary bonding or assembly step, reduces labor, and improves consistency versus post-mold assembly. On paper, it sounds like a straightforward efficiency gain.
08/07/2026
-
Cold Runner Clogging in LSR Injection Molding: A Practical Troubleshooting Guide
Cold runner systems are one of the main reasons manufacturers choose liquid silicone rubber (LSR) injection molding over conventional runner designs — no gate vestige, no flash to trim, and lower material waste. But when a cold runner starts to clog, that advantage disappears fast: production stops, scrap rates climb, and every hour of downtime costs real money.
08/04/2026
-
Pure Electric Servo Feeding System vs. Traditional Pneumatic Feeding: Which One Actually Saves You Money?
If you run an LSR (Liquid Silicone Rubber) injection molding line, the feeding system is easy to overlook — until it starts costing you scrap rate, downtime, and inconsistent shot weights. Two technologies dominate the market today: pneumatic (air-driven) feeding systems and pure electric servo feeding systems. Here's an honest, practical comparison to help you decide which fits your production line.
07/31/2026
-
How to Choose an LSR OEM Manufacturing Partner: A Buyer's Checklist
Outsourcing liquid silicone rubber production is as much a relationship decision as a technical one. A supplier can look strong on paper — certificates, equipment lists, a polished website — and still fall short once your product hits real production volume. Here's a practical checklist for evaluating an LSR OEM partner before you commit tooling and inventory to them.
07/29/2026
-
LSR Molding Trends from CHINAPLAS and K Shows: What Manufacturers Should Watch For
Every year, the global plastics and rubber industry converges on two major stages — CHINAPLAS in Asia and the K show in Düsseldorf — to preview where injection molding technology is headed.
07/28/2026
-
ISO 9001, CE, CCC: What These Certifications Actually Mean for Your Equipment Purchase
When you're evaluating LSR injection molding machines from an overseas supplier, certification logos on a company website can start to blur together. ISO 9001, CE, CCC — they all sound reassuring, but they don't all mean the same thing, and they don't all matter for the same reasons. Understanding what each certification actually covers will help you ask better questions during due diligence and avoid assuming a certificate guarantees something it doesn't.
07/17/2026
How Much A/B Mixing Ratio Error Causes Under-Cure in Liquid Silicone — and How Equipment-Level Monitoring Can Catch It
Liquid silicone rubber cures through a precise chemical reaction between two components — commonly called Part A and Part B — mixed at a specified ratio, most often close to 1:1. The entire process depends on that ratio staying within a narrow tolerance. What makes this particularly risky in production is that a mixing ratio error doesn't necessarily produce an obviously defective part. Parts can look, feel, and even measure correctly at the point of ejection, while curing is subtly incomplete in a way that only shows up later — as a soft spot, a tacky surface, reduced tear strength, or a part that fails a downstream mechanical or sterilization process.
Why Even a Small Ratio Error Matters
The A/B ratio isn't a rough guideline — it reflects the stoichiometric balance needed for the platinum-catalyzed addition reaction to complete properly. When the ratio drifts:
Excess of one component relative to the other leaves unreacted material within the cured network, which can reduce crosslink density even if the surface appears fully cured.
The effect is often localized and inconsistent rather than uniform across a shot, because ratio drift frequently originates from metering pump wear or calibration error rather than a batch-wide material issue — meaning some cavities or some regions of a part may be affected while others aren't.
Under-cure from ratio error can be difficult to distinguish visually from under-cure caused by insufficient cure time or temperature, which often leads to the wrong root cause being investigated first.
While the exact tolerance that causes a functional problem depends on the specific compound, part geometry, and application, ratio drift of only a few percentage points beyond the specified tolerance is generally enough to measurably affect cure completeness in sensitive formulations — well before the deviation would be obvious from a visual inspection alone.
Why This Is Primarily an Equipment Monitoring Problem, Not a Recipe Problem
Because the target ratio itself is usually well established and documented by the material supplier, the practical risk in production almost always comes from metering accuracy drifting over time, not from an incorrect target setting. This makes it fundamentally an equipment monitoring and maintenance issue.
Common sources of ratio drift at the equipment level include:
Metering pump wear, which gradually changes actual displacement per stroke even when the control system's commanded ratio hasn't changed
Static mixer degradation or partial blockage, which can cause incomplete or uneven mixing even when the volumetric ratio itself is correct
Feed pressure imbalance between the A and B sides, particularly in systems where viscosity differs between components or changes with temperature
Sensor or flow-meter calibration drift, similar in nature to the pressure sensor drift issue that affects injection consistency more broadly
How Equipment-Level Monitoring Can Catch This Before It Becomes a Batch Problem
Rather than relying only on downstream physical testing to catch ratio-related under-cure, several equipment-level monitoring approaches can flag the problem closer to the point where it occurs:
Real-time flow monitoring on both A and B sides, with automatic alarms if the actual measured ratio deviates from the target beyond a set tolerance — rather than only monitoring pump commands, which won't catch mechanical wear.
Pure electric servo dosing systems, which generally offer more precise and more repeatable metering than pneumatic systems, and often provide better diagnostic feedback on actual delivered volume rather than commanded volume.
Scheduled metering pump verification, using a physical volumetric or weight-based check against the system's own reported ratio, on a routine interval rather than only after a quality issue is reported.
Periodic post-cure verification testing — such as durometer spot checks or a simple tack test on a sampling basis — as a secondary check that complements equipment-side monitoring rather than replacing it.
Questions Worth Asking About a Machine's Metering System
What type of metering pumps are used for A and B dosing, and what is their rated accuracy and expected service life before recalibration or replacement is needed?
Does the control system monitor actual delivered flow on both sides in real time, or only the commanded setpoint?
Is there an automatic alarm if the real-time ratio deviates beyond a set tolerance, or does an operator need to notice a problem manually?
What is the recommended interval for physically verifying metering pump output against the system's reported values?
The Bottom Line
A/B mix ratio error is one of the clearest examples of a problem that's far cheaper to catch at the equipment level than to discover through a failed field part or a failed sterilization validation. Because the failure mode is often silent and localized rather than obviously visible, real-time flow monitoring and a routine metering verification schedule are worth treating as standard practice — not an optional upgrade — for any production line running precision or medical-grade LSR components.
